By BuildGreen · Updated 26 November 2026
The cost of BREEAM certification has four parts: BRE registration and certification fees, the assessor and consultancy fee, additional studies needed for the targeted credits, and the design measures themselves. The certification follows the project programme, from a pre-assessment at concept design to the final certificate after construction.
What the cost is made of
| Cost part | What it covers | Depends on |
|---|---|---|
| BRE fees | Registration and certification of the assessment | Scheme and building size |
| Assessor and consultancy | Pre-assessment, guidance to the design team, evidence review, reports | Scheme, size, complexity and target rating |
| Additional studies | For example LCA, ecology, energy and comfort modelling, acoustic testing | Which credits are targeted |
| Design measures | Envelope, systems, metering, materials | The gap between standard design and the target |
The stages of a BREEAM New Construction project
The duration is therefore the duration of design and construction. BREEAM In-Use, for existing buildings, is shorter because it assesses the building as it operates.
- Pre-assessment at concept design: the target rating and the credits to pursue are agreed.
- Registration of the project with BRE.
- Design-stage assessment: evidence from drawings and specifications, leading to an interim certificate.
- Construction: evidence from site, procurement, commissioning and testing.
- Post-construction assessment and final certificate.
How BREEAM affects the project
- Some credits must be actioned at an early design stage; an assessor should be appointed at concept design.
- The design team and the contractor provide evidence, so responsibilities should be written into their appointments and the tender.
- Specifications change in places: metering, materials with environmental declarations, water fittings, commissioning scope.
- A named person should own the BREEAM tracker on the client side.
What to check in an offer
- Which stages are included: pre-assessment, design stage, post-construction.
- Whether BRE fees are included or charged separately.
- Which additional studies are included and which are optional.
- How many site visits and design workshops are covered.
- The target rating the offer is based on.