Real Estate Decarbonisation

REAL ESTATE DECARBONISATION

Real Estate Decarbonisation

Real estate decarbonisation is a costed plan to cut the carbon emissions of a building or a portfolio in line with a target such as a CRREM pathway or net zero. BuildGreen measures the baseline, models the reduction scenarios and sequences the measures against lease events and capital plans.

Contact Us

REAL ESTATE DECARBONISATION

From Carbon Baseline to Net Zero Roadmap

A decarbonisation plan answers three questions for every asset: where it stands today, when it falls behind its pathway, and which measures bring it back at the lowest cost.

Carbon Baseline and CRREM Stranding Analysis

01

Carbon Baseline and CRREM Stranding Analysis

The baseline is the measured energy use and carbon emissions of each building, per square metre and per year. We compare it with the CRREM pathway for the building's country and property type.

The analysis shows the stranding year: the point at which the building's emissions rise above its pathway, and with it the size of the gap to close.

Net Zero Roadmaps for Assets and Portfolios

02

Net Zero Roadmaps for Assets and Portfolios

A net zero roadmap lists the measures that bring a building back under its pathway, with the carbon saved, the investment and the year for each one. Measures are timed with plant replacement, lease events and planned refurbishment.

For a portfolio, the roadmap ranks the assets, so capital goes first to the buildings where each euro removes the most carbon.

Electrification and Renewable Energy

03

Electrification and Renewable Energy

Most operational carbon in buildings comes from burning gas for heat and from grid electricity. We assess the replacement of fossil-fuel heating with heat pumps, the potential for on-site photovoltaics, and the options for buying renewable electricity.

Each option is sized against the building's demand and the capacity of its grid connection.

Embodied Carbon and Low-Carbon Materials

04

Embodied Carbon and Low-Carbon Materials

For new construction and major refurbishment, the materials can carry as much carbon as decades of operation. We quantify embodied carbon with a life cycle assessment and set a carbon budget for the project.

Design and procurement teams then receive lower-carbon alternatives for the structure, the facade and the fit-out, with the saving each one brings.

HOW A DECARBONISATION PLAN IS BUILT

How it’s done

  1. 01

    Baseline

    We collect energy and emissions data for each building and compare it with the target pathway for its country and type.

  2. 02

    Scenarios

    We model the reduction measures, alone and combined, and calculate the carbon saved and the investment needed for each scenario.

  3. 03

    Roadmap

    The chosen measures are placed on a timeline that follows lease events, plant replacement cycles and capital plans.

  4. 04

    Track

    Emissions are measured every year against the pathway, and the roadmap is adjusted as buildings and regulations change.

COST

What the cost depends on

  1. 01

    Number of assets

    A single building or a portfolio, and how different the buildings are from one another.

  2. 02

    Quality of the data

    Complete energy data gives a baseline quickly; gaps have to be filled or estimated.

  3. 03

    Depth of the roadmap

    A stranding analysis only, or a costed measure-by-measure plan for each asset.

  4. 04

    Follow-up

    One-off study, or yearly tracking of progress against the pathway.

The figure depends on your building, so it comes in an offer, after a short discussion about the project. Tell us the building type, its size, the stage it is at and the level you are aiming for.

Request an offer

FAQS

Common questions about decarbonisation

What to fund first, what CRREM and stranding mean, and how a decarbonisation plan supports EU Taxonomy, CSRD and GRESB reporting.

More FAQs

Start with measures that cut energy use at low cost, such as controls and operational optimisation. Then replace fossil-fuel heating with electric systems such as heat pumps when the existing plant reaches the end of its life, add on-site renewable energy, and improve the building envelope at the next refurbishment. Green electricity procurement covers what remains, and offsets are the last step, not the first.

CRREM (Carbon Risk Real Estate Monitor) publishes decarbonisation pathways for each country and property type, expressed as carbon and energy intensity per square metre per year and aligned with the Paris Agreement. A building is stranded in the year its emissions intensity rises above its pathway, which signals a risk of lower value, harder financing or mandatory retrofit.

Operational carbon is emitted by running a building: heating, cooling, ventilation, lighting and equipment. Embodied carbon is emitted by producing, transporting, installing, replacing and disposing of its materials. A decarbonisation plan for an existing building focuses on operational carbon, while new construction and major refurbishment must address both.

The EU Taxonomy, CSRD reporting and the GRESB real estate benchmark all ask for measured emissions, a reduction target and evidence of progress. A decarbonisation roadmap supplies these: a carbon baseline, a pathway such as CRREM, and a costed list of measures with dates.

Progress is tracked by measuring energy use and emissions every year against the baseline and the target pathway, for each building and for the portfolio. BuildGreen uses CarbonTool, the carbon accounting platform it built, to keep the inventory, the targets and the reduction initiatives in one place.

CONTACT US

Looking for a sustainability solution?

Get in touch with our team of sustainability consultants to explore tailored solutions in ESG strategy, carbon footprint reduction, and green building certifications (BREEAM, LEED, WELL, EDGE). We provide personalized guidance to help organizations meet regulations, achieve net zero targets, and add long-term value to their assets.