Climate Change Adaptation and Climate Risk Assessment

CLIMATE ADAPTATION

Climate Change Adaptation and Climate Risk Assessment

A climate risk assessment identifies the physical climate hazards a building is exposed to, such as heat, flooding, drought and storms, and how vulnerable it is to each over its lifetime. BuildGreen assesses the risks, proposes adaptation measures and documents the result for the EU Taxonomy, BREEAM and lenders.

Contact Us

CLIMATE ADAPTATION

Buildings Ready for a Changing Climate

An adaptation study shows which climate hazards matter for a specific site, what they could cost, and which measures reduce the risk.

Climate Risk and Vulnerability Assessment

01

Climate Risk and Vulnerability Assessment

A climate risk and vulnerability assessment screens a site against the physical climate hazards: temperature, wind, water and ground related. It uses climate projections for the expected lifetime of the building, not only past records.

For each hazard that matters, we assess how exposed and how sensitive the building is, and rate the resulting risk to the asset and its occupants.

Adaptation Plans

02

Adaptation Plans

An adaptation plan lists the measures that reduce each material risk: shading and passive cooling against overheating, flood protection and raised plant against water, drainage and water reuse against drought and heavy rain.

Each measure comes with its cost, the risk it removes and the best moment to carry it out, in design, at refurbishment or in operation.

EU Taxonomy Adaptation Evidence

03

EU Taxonomy Adaptation Evidence

EU Taxonomy alignment requires that a building does no significant harm to climate change adaptation. That means a documented climate risk and vulnerability assessment and an adaptation plan for the material risks.

We prepare the assessment in the form auditors, banks and investors expect, so it can be used directly in the Taxonomy file.

Nature-Based Solutions

04

Nature-Based Solutions

Green roofs, trees, permeable surfaces and retention areas cool a site, slow rainwater and support biodiversity at the same time. They often cost less than engineered alternatives and add value to the property.

We design them as part of the adaptation plan and align them with the ecology credits of BREEAM and LEED.

HOW A CLIMATE RISK ASSESSMENT RUNS

How it’s done

  1. 01

    Screen hazards

    We check the site against the full list of climate hazards, using climate projections for the lifetime of the building.

  2. 02

    Assess vulnerability

    For each relevant hazard we assess which parts of the building and its operation are exposed and how severe the effect would be.

  3. 03

    Plan adaptation

    We propose measures for the material risks, with their cost and timing, and state the risk that remains after them.

  4. 04

    Document

    The assessment and the adaptation plan are delivered in the form required by the EU Taxonomy, BREEAM, lenders and investors.

COST

What the cost depends on

  1. 01

    Number of sites

    One building or a portfolio across several locations.

  2. 02

    Hazards that matter

    Sites exposed to several material hazards need more analysis than low-risk ones.

  3. 03

    Depth of the study

    A screening, or a detailed assessment with an adaptation plan.

  4. 04

    Purpose

    The form required: EU Taxonomy evidence, a BREEAM credit or lender due diligence.

The figure depends on your building, so it comes in an offer, after a short discussion about the project. Tell us the building type, its size, the stage it is at and the level you are aiming for.

Request an offer

FAQS

Common questions about climate adaptation

What a climate risk assessment tells you, when the EU Taxonomy requires one, and how it counts towards BREEAM and LEED.

More FAQs

A climate risk assessment shows which physical climate hazards matter for a specific building, such as heat waves, flooding, drought, storms or subsidence, now and under future climate scenarios. It identifies which parts of the building and its operation are vulnerable, proposes adaptation measures for the material risks and states the risk that remains.

Yes. To be Taxonomy-aligned, a construction, renovation or building ownership activity must do no significant harm to climate change adaptation, which requires a climate risk and vulnerability assessment based on climate projections over the expected lifetime of the building, and an adaptation plan for the material risks found.

Physical risk is damage or disruption caused by the climate itself, such as flooding or overheating. Transition risk comes from the shift to a low-carbon economy: stricter regulation, carbon pricing and changing tenant and investor demand. Climate adaptation addresses physical risk, while decarbonisation addresses transition risk.

A climate risk assessment is done at site selection or acquisition, where it informs the price and the due diligence, and at design stage, where adaptation measures cost least to include. Existing buildings are assessed for financing, for EU Taxonomy reporting and before a major refurbishment.

Yes. BREEAM New Construction has a dedicated credit for adaptation to climate change and BREEAM In-Use has a Resilience category. LEED rewards resilient design and its newest version adds a climate resilience assessment. One assessment can serve the certification and the EU Taxonomy evidence together.

CONTACT US

Looking for a sustainability solution?

Get in touch with our team of sustainability consultants to explore tailored solutions in ESG strategy, carbon footprint reduction, and green building certifications (BREEAM, LEED, WELL, EDGE). We provide personalized guidance to help organizations meet regulations, achieve net zero targets, and add long-term value to their assets.

Contact Us
BuildGreen sustainability consultants at work
Bucharest, RomaniaCotroceni Park, 7 Iuliu Maniu Boulevard