By BuildGreen · Updated 26 November 2026
Fund first the measures that save the most energy for the least money and disruption: operational optimisation and controls. Then replace plant at the end of its service life with efficient, electric systems, add renewable energy, and upgrade the building envelope when a refurbishment is already planned. Offsets come last.
A practical order of measures
| Order | Measure | Cost | Disruption | Best moment |
|---|---|---|---|---|
| 1 | Schedules, setpoints, BMS optimisation, re-commissioning | Low | None | Now |
| 2 | LED lighting and lighting controls | Low to medium | Low | Now or at tenant change |
| 3 | Metering and energy monitoring | Low | Low | Now |
| 4 | Pumps, fans, heat recovery, variable-speed drives | Medium | Low | At maintenance cycles |
| 5 | Heat pumps replacing gas boilers; efficient chillers | High | Medium | At end of plant life |
| 6 | On-site photovoltaics | Medium | Low | When roof and grid allow |
| 7 | Facade, glazing and roof insulation | High | High | At major refurbishment |
| 8 | Renewable electricity procurement, then offsets | Ongoing | None | For what remains |
Why this order
- Operational measures cost little and reveal how much of the consumption is waste rather than need.
- Reducing demand first means the new heating and cooling plant can be smaller and cheaper.
- Plant replaced before the end of its life wastes its remaining value; replaced like-for-like at the end, it locks in emissions for another twenty years.
- Envelope works are the most disruptive and are only economical when scaffolding and vacancy are already planned.
How the measures are ranked for a specific building
The general order is a starting point. An energy audit gives each measure its real saving, cost and payback for the building in question, and a decarbonisation roadmap adds the carbon saved and the date by which the building would otherwise fall behind its CRREM pathway. Together they turn a list of ideas into a funded sequence.