By BuildGreen · Updated 26 November 2026
A LEED pre-assessment is a feasibility review that checks a project against every LEED prerequisite and credit and sets a realistic target level. Its output is the LEED scorecard: a list of all credits marked as targeted, possible or not pursued, with the points each one is expected to earn.
What a pre-assessment covers
- Choice of the rating system: BD+C, ID+C or O+M, and the adaptation within it.
- A check of every prerequisite: any that cannot be met stops the certification.
- A credit-by-credit review of what the current design or building already achieves.
- The measures and studies needed for the remaining points, with an indication of effort.
- A recommended target level with a margin above its threshold.
How to read a LEED scorecard
The scorecard lists the credit categories and, under each, its prerequisites and credits. Every credit has three columns: yes, maybe and no. The total of the yes column is the score the project can count on; the maybe column is the reserve.
| Column | Meaning | How to use it |
|---|---|---|
| Yes | Points the project is confident of achieving | Should already reach the target level |
| Maybe | Points that need a decision, a study or a cost | Decide early which become yes |
| No | Points not pursued or not achievable | Review once, then stop spending time on them |
When to do it
Before the design is fixed, and for location-dependent credits, before the site is chosen. A scorecard prepared after tender mostly records what is no longer possible. The scorecard is then kept up to date through design and construction, and each credit is assigned to the team member responsible for its documentation.